{"id":5688,"date":"2020-01-21T21:06:42","date_gmt":"2020-01-21T21:06:42","guid":{"rendered":"https:\/\/greatlakesway.com\/?p=5688"},"modified":"2020-01-21T21:06:42","modified_gmt":"2020-01-21T21:06:42","slug":"dock-repair","status":"publish","type":"post","link":"https:\/\/greatlakesway.com\/dock-repair\/","title":{"rendered":"Dock Repair"},"content":{"rendered":"
Project 989-17
\nCleveland, OH<\/p>\n
Many miles of steel sheet-pile bulkhead walls have been constructed over the years to support the banks of the \u201cCrooked River.\u201d The renowned manufacturing company hired The Great Lakes Construction Co. to replace a portion of wall by placing new steel sheet-pile sections in front of the original sheets. At Project 989-17, the Pile Driving crew installed a river wall, an anchor wall and tie-rod anchors to connect the two. This important facility has existed on the Cuyahoga Riverfront since the turn of the century \u2013 the last century \u2013 when products manufactured here were loaded directly onto river vessels and railroad cars which ran along the riverbank. The formerly bustling industrial center is now occupied by a state-of-the-art research and development center. Great Lakes Construction was proud to be invited to make infrastructure improvements to this dynamic corporate campus.<\/p>\n<\/div>\n<\/div><\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"
Project 989-17 Cleveland, OH Many miles of steel sheet-pile bulkhead walls have been constructed over the years to support the banks of the \u201cCrooked River.\u201d…<\/p>\n","protected":false},"author":255,"featured_media":5678,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41],"tags":[],"cp_meta_data":{"_edit_lock":["1579640685:249"],"_edit_last":["249"],"_thumbnail_id":["5678"],"masonry_settings":["a:1:{s:4:\"size\";s:2:\"11\";}"],"_yoast_wpseo_content_score":["90"],"panels_data":["a:3:{s:7:\"widgets\";a:1:{i:0;a:9:{s:5:\"title\";s:0:\"\";s:4:\"text\";s:927:\"Project 989-17\nCleveland, OH\n\nMany miles of steel sheet-pile bulkhead walls have been constructed over the years to support the banks of the \u201cCrooked River.\u201d The renowned manufacturing company hired The Great Lakes Construction Co. to replace a portion of wall by placing new steel sheet-pile sections in front of the original sheets. At Project 989-17, the Pile Driving crew installed a river wall, an anchor wall and tie-rod anchors to connect the two. This important facility has existed on the Cuyahoga Riverfront since the turn of the century \u2013 the last century \u2013 when products manufactured here were loaded directly onto river vessels and railroad cars which ran along the riverbank. The formerly bustling industrial center is now occupied by a state-of-the-art research and development center. Great Lakes Construction was proud to be invited to make infrastructure improvements to this dynamic corporate campus.\";s:20:\"text_selected_editor\";s:4:\"html\";s:5:\"autop\";b:1;s:12:\"_sow_form_id\";s:32:\"19263238705e2767c200348234351460\";s:19:\"_sow_form_timestamp\";s:13:\"1579640797483\";s:11:\"panels_info\";a:6:{s:5:\"class\";s:31:\"SiteOrigin_Widget_Editor_Widget\";s:4:\"grid\";i:0;s:4:\"cell\";i:0;s:2:\"id\";i:0;s:9:\"widget_id\";s:36:\"233eb001-29fa-4b11-a5ae-671ec1d34648\";s:5:\"style\";a:2:{s:27:\"background_image_attachment\";b:0;s:18:\"background_display\";s:4:\"tile\";}}s:22:\"so_sidebar_emulator_id\";s:20:\"sow-editor-568810000\";s:11:\"option_name\";s:17:\"widget_sow-editor\";}}s:5:\"grids\";a:1:{i:0;a:2:{s:5:\"cells\";i:1;s:5:\"style\";a:0:{}}}s:10:\"grid_cells\";a:1:{i:0;a:4:{s:4:\"grid\";i:0;s:5:\"index\";i:0;s:6:\"weight\";i:1;s:5:\"style\";a:0:{}}}}"],"_yoast_wpseo_primary_category":["41"],"fullframe-layout-option":["default"],"fullframe-header-image":["default"],"fullframe-sidebar-options":["default-sidebar"],"fullframe-featured-image":["default"]},"yoast_head":"\n