MetroHealth Mass Excavation

Project 138-19
Cleveland, OH

Great Lakes has completed backfill and stabilization of the 1st floor groundwork of the new MetroHealth hospital tower. The north, east, and west wall shoring systems have been removed and the perimeter of the building backfilled to grade. The south perimeter and shoring wall is to be removed at a later date. Future Great Lakes work includes the paving of the loading dock area in 2021 as well as additional work with Turner Construction and their subcontractors in removal of hospital louvers, additional sanitary runs, excavation, and backfill for duct bank along Scranton Road.