Menu Close

Arcelor Mittal Vista Pointe Landfill

Project 860-15
Cleveland, OH

Great Lakes Construction completed a project at ArcelorMittal to install a liner and leachate collection system on a 7.6 acre area of their Cleveland facility. The project included 6,500 CY of excavation, 2,000 LF of leachate pipe and a 12,200 CY cap over the HDPE textured geomembrane liner system.