US-50 Bridge Replacement

Project 255-11
ODOT, DISTRICT 8, US-50 Bridge Replacement
Cincinnati, OH

The project involved two parts. Part 1 reconfigured River Road (US-50) along with the complete removal and replacement of the Waldvogel Viaduct with four steel girder bridges. Part 1 also included the construction of nine MSE walls, over 5 million pounds of new steel bridges, over 25,000 LF of piling and over 10,000 CY of structural concrete. Part 2 reconstructed portions of the 6th St. Viaduct that is east of the Waldvogel Viaduct. Part 2 also included five bridge deck removals and replacements and five bridge deck overlays with associated milling and asphalt repaving of the surface roads.